Attachments15-Nov-2012 [8070]
• A retaining wall that was on drawings wasn't found, resulting in an additional 750,000 cost
Link preview
see url detail
Open this link in a new window.
Auto preview is off. Preview link, or open link in new window.
Attachments to link: GM18.12 Amendment to Purchase Order No. 6035502 - For Nathan Phillips Square Reflecting Pool and Ice Rink Renovation Project